What must a locality's ordinance require for submission and approval?

Study for the DEQ Stormwater Management Inspector Test. Use flashcards and multiple choice questions with hints and explanations to prepare for your exam. Get ready and certified!

Multiple Choice

What must a locality's ordinance require for submission and approval?

Explanation:
Local ordinances require submission and approval of both an erosion and sediment control plan and a stormwater management plan. The ESC plan focuses on construction-phase measures to keep soil from washing off the site, using controls like silt fences, stabilized entrances, sediment basins, and timely stabilization. The SWM plan addresses post-construction runoff, detailing how the site will manage and treat stormwater over the long term to meet water quality and quantity goals. Requiring both plans ensures the project controls erosion during construction and manages the resulting runoff after construction is finished, in line with state and local requirements.

Local ordinances require submission and approval of both an erosion and sediment control plan and a stormwater management plan. The ESC plan focuses on construction-phase measures to keep soil from washing off the site, using controls like silt fences, stabilized entrances, sediment basins, and timely stabilization. The SWM plan addresses post-construction runoff, detailing how the site will manage and treat stormwater over the long term to meet water quality and quantity goals. Requiring both plans ensures the project controls erosion during construction and manages the resulting runoff after construction is finished, in line with state and local requirements.

Subscribe

Get the latest from Passetra

You can unsubscribe at any time. Read our privacy policy