Browse all practice questions for the DEQ Stormwater Management Inspector Practice Test. Search by topic, open any question and review its full explanation, then test yourself in the practice quiz.

DEQ Stormwater Management Inspector Practice Test course image
More practice questions

These questions are part of the practice quiz. Start practicing

  • Simple rooftop connections are generally not advisable for residential lots with an area less than how many square feet?
  • Which post-construction BMP involves vegetation to slow and treat runoff?
  • What do as-built drawings document?
  • Which of the following is a required method for handling concrete wash water?
  • What is the purpose of a riser in stormwater management?
  • How long must the Locality VSMP Authority Registration Statement be documented and retained after project completion or permit termination?
  • For how long must the Locality VSMP Authority Registration Statement be retained after project completion or permit termination?
  • In IDDE investigations, what is one essential action to take immediately upon discovering a discharge?
  • What is the recommended seam overlap for geotextile fabric on the sides of a bioretention area?
  • Does the SWPPP have to contain control measures for support activity areas?
  • How long must the VSMP authority keep inspection reports after permit termination?
  • What is a structural BMP and provide two examples?
  • Which of the following is not used to protect storm drains and minimize sediment leaving the site?
  • How often must qualified personnel inspect temporary stabilized areas?
  • What events require modifications to the Note in SWPPP?
  • How deep should bottom soils be ripped for better infiltration?
  • How can a field inspector ensure stabilization of disturbed areas within seven days of disturbance?
  • Which term stands for a toxic chemical compound once used in electrical equipment?
  • The stormwater management plan addresses runoff during construction or after?
  • Why is recordkeeping important for DEQ inspections and what records should be retained?
  • Where must the underdrain be installed for level one porous concrete?
  • What is the minimum width of a gravel diaphragm trench?
  • Which feature protects the spillway from erosion in an extended detention basin?
  • Which approach aims to reduce stormwater runoff and improve water quality in Virginia?
  • What constitutes a complete BMP maintenance record?
  • Which legal instrument provides a VSMP inspector access to property for conducting post-construction inspections?
  • A stormwater outfall is discharging visibly to a stream during a rain event. What immediate action should you take?
  • Which is the correct sequence of construction in erosion and sediment control planning?
  • What is the purpose of the stone jacket layer in a bioretention system?
  • What is the primary objective of stormwater management under DEQ regulations?
  • Which statement describes the requirement for support areas under the GP?
  • If support activity areas are covered under the construction GP, what must the SWPPP include?
  • Which of the following are pretreatment options for small-scale infiltration?
  • How does the rate of runoff change after development?
  • How long does it take to fully establish a vegetated roof?
  • Which method is permitted to make the SWPPP available to the public?
  • In a storage basin, a riser primarily functions to:
  • When performing an inspection, what is the first step you should take upon arrival at a construction site?
  • Which of the following is NOT one of the five common classes?
  • Which pollutants are commonly elevated due to stormwater runoff from impervious surfaces?
  • Which action corresponds to the third prior installation step for filter soil media?
  • When a filtering practice is used as a sediment basin during construction, how should its bottom elevation compare to the sediment trap bottom?
  • What is the maximum slope for Level 1 (Dry) Swale?
  • Which documents are typically reviewed during final site closeout to demonstrate compliance?
  • Which action is NOT typically considered an enforcement action?
  • Which statement best distinguishes temporary stabilization from permanent stabilization?
  • Temporary stabilization must be applied to bare areas that may not be at final grade but will remain dormant for longer than 14 days within how many days?
  • Which two plans in the SWPPP must be approved?
  • What feature does an armored spillway primarily provide during high flows?
  • Which acronym corresponds to Environmental Site Design?
  • Which regulatory framework governs most stormwater discharges from construction activities in Virginia?
  • What is the maximum flow length of sheet flow from adjacent pervious areas?
  • Who is primarily responsible for verifying on-site BMP performance during construction?
  • How often should active construction sites be inspected for erosion and sediment control during active grading, according to typical DEQ expectations?
  • How should you determine the appropriate BMP for a site’s slope and soils?
  • What is the second prior installation step for filter soil media (bioretention)?
  • Within how many days must permanent or temporary soil stabilization be applied to bare areas after final grade is reached?
  • Why is outfall mapping important in an MS4 program?
  • What is the maximum flow length of sheet flow from adjacent impervious areas?
  • What action should an inspector take if a BMP issue is observed during rainfall?
  • What is the lower limit of imperviousness that can result in stream degradation?
  • VAMP stands for which program?
  • What is the purpose of a sediment control measure such as a silt fence around a disturbed area?
  • Name a post-construction BMP that reduces peak runoff and improves water quality.
  • How should a field inspector handle a discrepancy between observed BMPs and what is shown on the project plan?
  • Which statement about final permit closure documents and stabilization is correct?
  • Which program regulates erosion and sediment control in Virginia?
  • Which term refers to practices to prevent soil erosion and sediment runoff?
  • A riser is used to control the water level within which types of stormwater management structures?
  • Why is chain-of-custody documentation important for stormwater sampling?
  • What is the required timeline to fix an improperly installed erosion control practice after discovery?
  • What is the purpose of a site map/narrative in a SWPPP?
  • What is the first step in the prior installation steps for filter soil media (bioretention)?
  • What is the maximum amount of a pollutant a water body can receive and still meet water quality standards?
  • When must construction record drawings be submitted?
  • What is the significance of a stabilization certificate?
  • What should be included in an outfall inspection report?
  • What distinguishes the Virginia construction general permit from the post-construction stormwater permit?
  • What is the purpose of the initial soil test during the compost soil amendment process?
  • Which statement best describes the relationship between imperviousness and stream degradation risk?
  • Permanent vegetation is considered established when which condition is met?
  • In design terms, an emergency spillway is sized to handle:
  • During construction site inspections by the VSMP Authority, which plans are checked for compliance?
  • What is the minimum recommended filter media depth for Level 2 Bioretention Filter and Basin?
  • Which of the following lists three permanent stormwater BMPs commonly required for post-construction sites?
  • Which pollutant is primarily targeted by sediment controls in runoff?
  • In construction site inspections, which criterion would indicate non-compliance with a permit's SWPPP requirements?
  • During a major storm when the main outlet capacity is exceeded, how does the emergency spillway function?
  • Which of the following must be included in a SWPPP?
  • Which plan is designed to control erosion and sediment during construction?
  • What destructive forces does the SWM regulation protect against?
  • Which acronym stands for Total Maximum Daily Load?
  • How does the DEQ evaluate compliance during an inspection?
  • Which items are required by the Virginia construction stormwater permit framework?
  • The purpose of an emergency spillway is to provide:
  • Which of the following is listed as a penalty violation example?
  • Which permit in Virginia governs discharges from active earth-disturbing activities and requires a SWPPP?
  • Under a DEQ NOV, which conditions typically trigger corrective actions?
  • Which property is not part of the initial soil test?
  • Which category includes handling and disposal of wastes on site?
  • What is an illicit discharge detection and elimination (IDDE) program and what are its key components?
  • What protection is required for all permeable areas in sediment control practice?
  • Which of the following is an impervious surface example?
  • What is the final stabilization step in erosion and sediment control planning?
  • What must a locality's ordinance require for submission and approval?
  • Between the gravel and the underlying soil trench, what material should be placed?
  • What impact does impervious cover have on water quality?
  • Which of the following is an enforcement action that a DEQ or local agency might take for noncompliance?
  • What is the minimum length of the engineered level spreader lip per unit inflow?
  • Which acronym represents the Virginia Runoff Reduction Method?
  • Which acronym stands for the Center for Watershed Protection?
  • Which plan addresses post-construction runoff?
  • Who must seal and sign a construction record drawing, and when must it be submitted to the VSMP authority?
  • Which of the following is included as one of the five common classes of BMPs for erosion and sediment control?
  • What are the steps to convert a sediment basin to a wet pond?
  • Which permit program regulates point source discharges into waters of the Commonwealth?
  • What is the role of the permit framework's combination of SWPPP, ESC, and BMPs?
  • In MS4 operations, what is the primary goal of the Annual Inspection/Monitoring Program?
  • Which properties are typically evaluated in the initial soil test for compost amendments?
  • CBPA stands for which act?
  • What is the incremental thickness for soil media installation in bioretention?
  • Which BMP class focuses on preventing erosion by stabilizing exposed soils and surfaces during construction?
  • When must the locality VSMP authority return or terminate any bonds or securities provided by the operator?
  • Maximum Penalty under the Stormwater Act
  • What is meant by 'permanent stabilization' in a construction project?
  • The Chesapeake Bay Preservation Act (CBPA) is legislation aimed at protecting and restoring what?
  • Which feature would most likely be found in an extended detention basin as a sediment management feature?
  • What is the typical maximum slope percentage for a Wet Swale?
  • If an erosion control fix requires more time than seven days, what is required to extend the deadline?
  • What is the purpose of pre-filtration in rainwater harvesting?
  • Armored spillways are designed to do which of the following?
  • Which feature handles overflow in an extended detention basin?
  • Which statement best describes temporary erosion controls compared with post-construction controls?
  • Which statement correctly describes an emergency spillway?
  • What is the role of the inspector in preventing illicit discharges from a facility's operations?
  • What material is used on the sides of a bioretention area to separate the underdrain layer, with an overlap?
  • Which statement describes the difference between a plan reviewer and a field inspector in stormwater management?
  • Which acronym corresponds to the Virginia Stormwater Management Act?
  • In MS4 programs, street sweeping frequency is often higher in which areas?
  • Which of the following should be included in an outfall inspection report?
  • Which of the following is NOT a part of an extended detention basin?
  • Which is the design approach to minimize environmental impact during development?
  • Which statement about armored spillways is true?
  • What is the purpose of post-construction stabilization and its timing relative to project completion?
  • What must be done with hardened and liquid concrete waste?
  • How often does the VSMP Authority conduct construction site inspections to verify compliance?
  • What is the minimum distance to plant trees beyond the embankment toe and abutment contacts?
  • BMP stands for which term?
  • Which of the following is NOT an element of vegetated roof systems?
  • Which statement best describes why stabilization BMPs are used on active construction sites?
  • Which of the following is NOT typically considered a permanent post-construction BMP?
  • What is an outfall log and why is it important for DEQ reporting?
  • Which action best describes how to perform an outfall inspection?
  • What is the primary purpose of a Sediment Forebay?
  • What is the purpose of as-built drawings in stormwater management?
  • DEQ conducts a program review at what interval?
  • Which description about armored spillways is correct?
  • How can improper storage of chemicals and fuels on a site contribute to stormwater pollution?
  • What thickness of choker/pea gravel is used as a filter between the underdrain and the soil media layer in bioretention?
  • What is the primary function of an armored spillway?
  • In a compost-amended soil area, at what size should erosion control measures such as silt fences be used to reduce erosion and trap sediment?
  • Which statement best describes a post-construction BMP?
  • What is the purpose of outlet protection on sediment basins?
  • Where must vegetated emergency spillways be constructed?
  • Where must the Notice of Coverage Letter be posted at a construction site?
  • Which of the following is an example of a non-stormwater discharge that is often exempt from illicit discharge prohibitions?
  • Which sampling parameter is commonly measured in stormwater monitoring to indicate water quality improvement?
  • What is the purpose of a post-construction maintenance agreement?
  • Which is an example of an infiltration practice?
  • Define illicit discharge in the context of stormwater management.
  • For Level 2 Constructed Wetland, the flow path ratio should be at least?
  • What methods can inspectors use to evaluate BMP effectiveness?
  • Which item is NOT typically a focus of the MS4 Annual Inspection/Monitoring Program?
  • How do sediment controls affect total suspended solids (TSS) in runoff?
  • Which act governs Virginia stormwater management?
  • Which document provides the legally binding requirements for erosion and sediment control in Virginia and is administered by the DEQ?
  • Which organization is focused on promoting healthy watersheds?
  • The DEQ conducts program reviews at what interval?
  • What is a primary purpose of as-built (record) drawings in project closeout?
  • Which option best describes a riser's role in stormwater structures?
  • Which of the following describes what must be included in the General Information in SWPPP?
  • What does DEQ stand for?
  • What is the purpose of rainfall data in planning and inspecting stormwater BMPs?
  • Which materials can be used to construct check dams in grass channels?
  • How is street sweeping frequency typically determined in MS4 programs?
  • Which statement best differentiates construction site erosion controls from post-construction stormwater controls?
  • Which materials are acceptable for constructing a level spreader?
  • During construction, which perimeter protection measure is recommended to prevent sediment discharge?
  • What is the target pollutant in the water quality criteria?
  • What are the required dimensions for a gravel diaphragm trench, and what must be placed between the gravel and the underlying soil trench?
  • Which statement about risers is true?